Checks
Gearbox actuator
Removal
Refitting
Removing the rear box
Removing the epicyclic reduction gear train (E.R.G.)
Fitting the epicyclic reduction gear train (E.R.G.)
Adjusting epicyclic reduction gear train bearing end float
Adjusting main shaft end float
Synchronizing device assembly for engaging normal or reduced gears
Fitting
Removing the middle box
Removing the main shaft
Removing the drive input shaft
Removing the splitter synchronizing device
Fitting the splitter synchronizing device
Fitting the drive input shaft
Fitting the main shaft
Splitter control fork
Disassembly - Assembly
Gear control forks
Removal
Fitting
Transmission shafts
Front cover
Clutch release lever
Fitting the front cover
N45 MNA M10.00 - N67 MNA M15.00 15
7. M10.00/M15.00 INSTALLATION OVERVIEW 16
8. M10.00/M15.00 ELECTRICAL EQUIPMENT 17
9. M10.00/M15.00 MAIN ANALOG
INSTRUMENT PANEL 24
10. M10.00/M15.00 SECONDARY ANALOG
INSTRUMENT PANEL (fLyING BRIDGE) 28
11. M10.00/M15.00 DRILLING PLANS
FOR ANALOG PANELS 29
12. M10.00/M15.00 CUSTOMIZED
INSTRUMENT PANEL 30
13. M10.00/M15.00 WIRING DIAGRAMS
WARNINGS AND CAUTIONS 4
2. ENGINE PARTS AND COMPONENTS 6
3. INSTALLATION OVERVIEW 8
4. GENERAL INSTALLATION CRITERIA 9
5. TECHNICAL DATA FOR INSTALLATION 10
6. IDENTIFICATION DATA 12
7. FUEL LINE 13
8. ELECTRICAL EQUIPMENT 16
9. MAIN ANALOG INSTRUMENT PANEL 24
10. SECONDARY ANALOG INSTRUMENT PANEL 28
11. DRILLING PLANS FOR ANALOG PANELS 29
12. MAIN DIGITAL INSTRUMENT PANEL 30
13. SECONDARY DIGITAL INSTRUMENT PANEL 36
14. DRILLING PLAN FOR DIGITAL PANELS 37
15. CUSTOMIZED INSTRUMENT PANEL 38
16. SENSORS FOR DETECTION
AND PANEL SIGNALING 40
17. PREPARING THE ENGINE FOR FIRST START-UP 42
18. TESTS BEFORE THE FIRST START-UP 42
19. FIRST ENGINE START 43
20. EDC ANOMALIES INDICATION 44
21. BLINK CODE TABLE 45
22. UNDERWAY CHECKS 47
23. PREPARING THE ENGINE
FOR LONG IDLE PERIODS 48
24. WIRING DIAGRAMS 49
25. APPENDIX